OM building
Project
OM building
Country
Madrid, Spain
City
6.000 Mq
Project Description
The installation of Topfloor raised flooring in the OM building in Madrid has provided the building with exceptional flexibility. The panel system allowed for easy access to the underlying systems, facilitating maintenance operations and enabling the rapid adaptation of interior spaces to the changing needs of its users. This feature has proven particularly advantageous in today’s dynamic work environments, where workplace requirements are subject to frequent changes.
The high acoustic performance of Topfloor’s raised flooring contributed to creating a comfortable and productive workspace in the OM building. By utilizing sound-absorbing materials and a carefully designed system, it was possible to significantly reduce both impact and airborne noise, enhancing the acoustic quality of the spaces and fostering focus and communication among workers.
The choice of Topfloor raised flooring for the OM building was also driven by considerations of sustainability and energy efficiency. The materials used in the production of the panels are recyclable and environmentally friendly, while the installation system optimized the building’s thermal insulation, reducing energy consumption for heating and cooling. Additionally, the ease of access to the systems facilitated the installation of high-efficiency underfloor heating and cooling systems, further contributing to reducing the building’s environmental footprint.










